News Updates


EOI-Empanelment of Architects for Preparation of Master Plans for various schemes of KMDA New EOI-Empanelment of Consultants for Preparation of DPR for various projects of KMDA New EOI-Empanelment of Independent Consultants for supervision of various construction works under different sectors of KMDA New EOI-Consultancy services for master planning of River Front Development in Ganga river. New 7th Corrigendum of 20/SE/C-II/RB/KMDA of 2017-18 (2nd call) New
Expression of Interest and Terms of Reference. Preparation of DPR for Pollution abatement and rehabilitation of Bagjola Canal, Kolkata, WB New
(Expression of Interest) Preparation of Detailed Project Report for Pollution abatement and rehabilitation of Bagjola Canel, Kolkata, WB. New Expression of interest for empanelment of Independent Consultant for Supervision Works above Rs. 50 Crore under different Sectors of KMDA (except E-M Sector where it will be Rs. 20 Crores.) New Expression of interest for Preparation of conceptual plan of landscaping & Face-lifting work of ground floor of Unnayan Bhavan and peripheral baundary wall etc. New Agencies have been debarrd from participating in any tender of KMDA. New Khardah Sewer Network Project under AMRUT 3rd Call New Mahestala Sewer Network Project under AMRUT 3rd Call New Auction Notice of Common Service Cell, KMDA New Expression of Interest (C.S.Cell) New Long term Lease of KIT Shops New Traffic Advisory New SE(E/M)T-01 of 2017-2018 New Expression of Interest from Lift Manufacture for Enlistment in KMDA New Notice for Pensioners of KMDA Corrigendum-4 Barrackpore MWW 29-02-2016. DPR and Soil Report of Barrackpore MWW Scheme Abridged & Detail NIT for Barrackpore MWW-28.10.2015 Consultancy Services for River Front Development Corrigendum-III Request of Expression of Interest for Riverfront Development in Kolkata Metropolitan Area NIQ WBMAD/SE/PLANNING/NIQ - 02e/2015-16 (2nd call) NIQ WBMAD/SE/PLANNING/NIQ-03e/2015-16 (2nd call) Detailed Project Report for Development of Ganga Sagar
More...

Kmda Housing
Extension of brochure selling and application submission date of MADDHYANHA Housing Project Extension of brochure selling and application submission date of KALYANI Housing Project (Ph-III)

Ease of Doing Business (EODB) Services Provided by KMDA as notified by WBRTPS Act - 2013, Memo No. 2453-UD/O/M/ESTT./E-19/2014 (Pt-I) Dated - 19th July, 2017


SD & SWM Sector

Objectives:
  1. The sewerage scheme shall improve the existing sewerage network, provide missing links in the planned city and shall provide a new network in the uncovered areas of the municipalities.
  2. The drainage scheme shall improve the hygienic condition of the people residing in the planned city to a considerable extent during the monsoon period.
  3. The storm water drainage scheme introducing new drains and establishing proper outfall systems, in order to improve the infrastructure facilities shall thereby provide relief from water logging in the KMA area.
  4. The Solid Waste Management Project includes a sustainable Regional Waste Management Centre clubbing a cluster of municipalities and comprising of sanitary landfill sites, leachate treatment unit and septic tank sludge treatment facilities. This RWMC will reduce contamination of ground water and will improve living, environmental and hygienic condition of the people of all municipalities against municipal waste.

    Besides RWMC, there is provision of (a) transfer station for segregation of inert (non - composite / non-bio-degradable) materials for transportation to landfill sites and recycled waste for selling and (b) provision of mechanical compost plant / vermicomposting for processing of organic waste to organic manure for selling.

List of Projects implemented under SD & SWM Sector during the last five years.

Project Project Cost
(amount in Lakh of INR)
Completion year
Storm Water drainage scheme in Hooghly-Chinsurah Municipality 3881.96 2011
Storm Water Drainage for Bidhannagar Municipal Area 1915.53 2011
Storm Water drainage for Bansberia Municipality 2979.36 2012
Storm Water Drainage Scheme in Budge Budge Municipal Area within Kolkata U.A 3480.16 2014
Storm Water Drainage for Baranagar Municipal area within Kolkata U.A 3587.39 2014
Integrated Storm Water Drainage System Project for Madhyamgram Municipality within Kolkata Metropolitan Area. 7204.37 2014
Integrated Storm Water Drainage System Project for Barasat Municipality within Kolkata Metropolitan 8548.33 2014
Storm Water Drainage Scheme for Kamarhati Municipality, Kolkata 6757.05 2015
Drainage and Sewerage Project in Bidhannagar, Kolkata 2358.45 2016
Storm Water Drainage Project for Baruipur Municipality 6401.74 2016

List of On going major projects under SD & SWM Sector

Project Project Cost
(amount in Lakh of INR)
Storm water drainage for Rishra Municipality 5107.31
Storm Water Drainage in South Dum Dum Municipality, Kolkata 6616.98
Intrgrated Drainage Scheme for Netaji Subhash Chandra Bose Airport. 6136.85
Kolkata Solid Waste management Improvement Project. (A JICA assisted project) for Uttarpara Kotrung, Konnagar, Rishra, Serampore, Baidyabati, and Champdani Municipality. 3584 Million JPY (INR 170.0 Crore)