| Old |
Operation,Running & Maintanance 0f existing Modern fully Automatic 200 Kg/Hr. Chlorine leak Absorppion system at Salt Lake |
| Old |
Construction of E. M. Bye-pass connector from Kamalgazi to Padmapukur |
| Old |
Bid & Book Plots of your choice |
| Old |
Construction of Boundary Wall (Plain Type) at Fair Ground of the Central Park, Bidhannagar |
| Old |
CORRIGENDUM Auction for Land at 4 different locations the last date for procurement of Bid Documents is extended upto 10th June 2008. All other terms & Conditions and dates shall remain unchanged |
| Old |
Repair of Pavilion and other allied works at JHAUTALA GHAT at Budge-budge under GAP Phase-II |
| Old |
Supplying & laying of Chemically treated ornamental design interlocking concrete Block pavement within DAKSHINESWAR Temple Complex under GAP Phase-II |
| Old |
"Temporary Road Restoration along a certain stretch of Parts Road, in North Barrackpore Town, under GAP
" |
| Old |
Corrigendum to the Detailed N.I.T. No. 04/SE(C)/AD/KMDA of 2008-2009 |
| Old |
Construction of administrative building of proposed Medical College at J.L. Nehru Memorial Hospital campus, Kalyani, Nadia |
| Old |
ABRIDGED N.I.Q.No. 01/EE/TT(ND)/KMDA OF 2008-2009 |
| Old |
Abridged Notice Inviting T-ender No. 05/SE(C)/AD/KMDA of 2008-'09 dt.29.5.2008 |
| Old |
Abridged N.I.T.NO.06-/SE(N)/GAP/KMDA of 2008-09 Dtd: 23-5-2008. |
| Old |
Invitation of Expression of Interest for General Consultancy Work in East West metro Rail Project, Kolkata, India |
| Old |
Abridged Notice Inviting tender No. 01/SE/MC-II/E&M/KMDA of 2008-2009 |
| |
|