| Old |
Electrical Wiring in the CANTEEN Building of II SER at Haringhata , Nodia |
| Old |
Electrical Wiring in ENTRANCE BLOCK of Boys' Hostel of II SER at Haringhata Firm, Nodia |
| Old |
Dismantling the existing faulty 250 K V A transformer & installation & commissioning |
| Old |
Corrigendum to the Abridged N.I.T. No. 03/SE(C)/AD/KMDA of 2008-2009 |
| Old |
NIT No. 02/KMDA/E&M/EC-1 of 2008-09 |
| Old |
Installation of different rides and seating arrangement within park and playground at Mangalik Abasan |
| Old |
Construction of Main Pumping stations near Haren Mazumder Khal-I |
| Old |
Site clearance from close conduit & open channel drainage system from Gobinda Fatik to the outfall |
| Old |
Construction of balance work of (G+8) storied Shopping-cum-Residential Complex at AG Block |
| Old |
No. 214/EE/CSD/TT/KMDA/T-1 |
| Old |
Construction of 5 (five) Nos. (0+4) Storied L I G Building at Block-'AK', Sector-A under E.K.A.D. Project |
| Old |
Construction and commissioning of R.C.C. elevated Reservoir including pile foundation under Suface Water Supply |
| Old |
Construction of Two Storied MIG category Dwelling units in different location at Baishnabghata-Patuli Township |
| Old |
Sinking of 2(two) nos (200m X 300m) Deep tubwell at Nonadanga Housing Project |
| Old |
Tender No; EE(E/M)/SWTP/T-04 of 08-09 |
| |
|